Priority ERP integration specialists

Priority ERP API integration and platform bridging

Where Priority ERP sits at the centre of a wider stack, the risk is always purchase orders, stock valuations and nominal codes drifting out of sync. We build the bridge that keeps them aligned.

Fixed-scope engagements, delivered by UK-based integration engineers. Documentation and source code handed over on completion.

  • REST API
  • Web SDK procedures
  • Two-way sync

What we can connect Priority ERP to

Priority ERP holds stock, orders, products and financial records. Every other system in the business holds a partial copy of the same data. Our role is to make one the source of truth and keep the rest aligned — through the Priority ERP API, webhooks where they exist, and a bridging layer where the other system has no usable interface of its own.

Ecommerce and storefronts

Publish products, prices and stock from Priority ERP to your sales channels, and pull orders and customers back into one order book.

Shopify, WooCommerce, Magento, BigCommerce

Accounting and finance

Where finance runs on a separate ledger, keep Priority ERP and the accounts agreed on invoices, payments and nominal codes.

Sage, Xero, QuickBooks, Sage Intacct

Warehouse and 3PL

Send picks, putaways and shipments between Priority ERP and the warehouse system, with confirmations and stock adjustments written back.

Mintsoft, Peoplevox, SnapFulfil

CRM and sales

Give sales live stock, pricing and order status from Priority ERP inside the CRM, and push quotes and won deals back as orders.

Salesforce, HubSpot, Dynamics 365 Sales

Marketplaces

Consolidate Amazon and eBay demand into Priority ERP with per-channel buffers and a single fulfilment pipeline.

Amazon SP-API, eBay

Bespoke, EDI and legacy systems

Production lines, EDI trading partners and older databases connected through a controlled layer that speaks both sides.

EDI (EDIFACT/X12), SQL Server, SFTP, SOAP

Common Priority ERP integration use cases

Each is a defined, testable data flow rather than an open-ended development project.

01

Inventory as one master

Priority ERP owns stock; levels and cost prices propagate to every channel in near real time with per-channel buffer rules.

Outcome: oversells and safety-stock hoarding both fall.

02

Order ingestion pipeline

Orders from web, marketplace and EDI are normalised and created in Priority ERP with allocation in payment order.

Outcome: one queue, consistent SLAs.

03

Product data publishing

Catalogue, variants, media and pricing maintained in Priority ERP and pushed on change to the storefront and marketplaces.

Outcome: the catalogue is maintained once.

04

Finance handoff

Invoices, credits and payments move between Priority ERP and the ledger against a field-level ownership map.

Outcome: a clean close, no double entry.

05

Warehouse round trip

Shipments, tracking and stock adjustments flow between Priority ERP and the WMS or 3PL with idempotent confirmations.

Outcome: accurate stock and customer notifications.

06

EDI trading partners

Retailer EDI (orders, ASNs, invoices) translated to and from Priority ERP documents with validation and acknowledgements.

Outcome: chargebacks from format errors removed.

How a Priority ERP API integration is delivered

Four stages, fixed scope agreed before any code is written. Typical delivery for a single-system integration is two to four weeks.

Stage one

Discovery and data mapping

We document the systems involved, the direction of each flow, and every field that must move — including the awkward ones such as tax, discounts and multi-currency.

Output: written integration specification.

Stage two

Fixed scope and estimate

The specification becomes a fixed-price proposal with a delivery schedule and defined acceptance criteria. No time-and-materials open ends.

Output: costed scope for sign-off.

Stage three

Build and testing

Development against a Priority ERP development or sandbox environment and a sandbox of the destination system, with your own data used for acceptance testing.

Output: tested integration and test evidence.

Stage four

Go-live and handover

Controlled cutover with monitoring in place, followed by handover of code, credentials and documentation, and a period of hypercare support.

Output: live integration, owned by you.

Have a Priority ERP data flow in mind? We will tell you what it takes before you commit.

Request a scope

Priority ERP API bridging when there is no direct connector

Off-the-shelf connectors assume both platforms are modern, documented and willing to talk to each other. In practice one side is usually a warehouse system from 2009, a bespoke database or an ERP whose vendor charges per field. Bridging is the work of putting a controlled layer between the two.

Concretely: a queue so bursts don't overwhelm either side, retries failed calls against the Priority REST API rate limits, and a full transaction log so multi-entity and multi-currency postings is never in question. Priority ERP can change its API version without anything downstream noticing.

Where a platform genuinely has no interface, we work with what exists — scheduled SFTP file exchange, direct database connectors, or a documented REST wrapper we build and host on your behalf.

Included in every bridge we build

  • Error handling with alerting when a transfer fails
  • Automatic retries that respect the platform API rate limits
  • A transaction log for tracing any individual record
  • Idempotency so a repeated event cannot create a duplicate
  • Field-level mapping documentation you can hand to any developer
  • A staging environment that mirrors production

Priority ERP integration FAQs

A single-direction integration between Priority ERP and one business system is typically delivered in two to four weeks, including discovery, field-level mapping, build against a sandbox, acceptance testing with your own data and supported go-live. Multi-system programmes are phased.

Other platforms we integrate

Each platform has its own integration guide covering authentication, available endpoints and typical data flows.

Discuss your integration

Call 01303 883111 or email hello@api-integrations.co.uk. We will tell you honestly whether an integration is the right answer to the problem you have described.